The first batch of large-scale components Tianwan Nuclear Power Unit 7'from Russia arrived at Tianwan site
Time: 2021-08-24 Form: Jiangsu Nuclear Power Co., Ltd.

微信图片_20210813163954.png

On August 9, the first batch of Russian-supplied large-scale components and equipment of Tianwan Nuclear Power Unit 7, the shell of core catcher and packing arrived at Tianwan site via 12,000 nautical miles after lasting for 60 days, from the Port of St. Petersburg, Russia. 


The arrival of this batch of large-scale components for Russia is in a severe epidemic period both at home and abroad. In order to do a good prevention and control of the epidemic, Jiangsu Nuclear Power Co., Ltd. organized relevant units and departments to formulate an epidemic prevention and control plan for the large-scale components supplied to Russia. Through a series of measures such as port disinfection, nucleic acid sampling, and personnel monitoring, the risk of the epidemic has been completely eliminated and the health and safety of people is guaranteed. (News source: Jiangsu Nuclear Power Co., Ltd.)

你知道你的Internet Explorer是过时了吗?

为了得到我们网站最好的体验效果,我们建议您升级到最新版本的Internet Explorer或选择另一个web浏览器.一个列表最流行的web浏览器在下面可以找到.